Solar

Gujarat Solar Subsidy Calculator

Central + Gujarat state subsidy for rooftop solar up to 2.18 kWp, and what you pay.

kWp
Consumer category
kWp
₹/unit
Edit rates (advanced)
Central subsidy₹60,000PM Surya Ghar
Gujarat subsidy₹30,000Added on top
You pay₹10,000Total subsidy ₹90,000
Full breakdown
ItemAmount
System size2 kWp
Benchmark cost₹1,00,000
Central subsidy₹60,000
State subsidy₹30,000
Total subsidy₹90,000
Your contribution (General)₹10,000
You pay₹10,000
Yearly generation (≈1,400 units/kW)2,800 units
Yearly bill saving @ ₹7/unit₹19,600
Simple payback0.5 years

Download as PDF

Optional: add your details to print them on the PDF — fill only what you need. Nothing is uploaded; the PDF is made in your browser.

Add your details (optional)
One page, with the rates and conditions used.

Gujarat now tops up the central PM Surya Ghar subsidy for small homes. For a residential rooftop system up to 2.18 kWp, a household pays only 10% of a fixed benchmark cost (5% for SC/ST), and the state covers whatever the central subsidy leaves. This calculator shows the central subsidy, the Gujarat subsidy and the amount you actually pay.

The Gujarat top-up applies to systems commissioned on or after 22 October 2026 and is paid by direct bank transfer through your DISCOM — DGVCL, MGVCL, PGVCL, UGVCL or Torrent Power. A 2 kW system, for example, has a benchmark of ₹1,00,000, gets ₹60,000 central and ₹30,000 from the state, and costs a General household ₹10,000.

How the Gujarat subsidy is calculated

Benchmark cost is ₹50,000 per kW for the first 2 kW and ₹45,000 per kW above that. The state subsidy is the benchmark cost, minus the central subsidy, minus your own contribution of 10% of the benchmark (5% for SC/ST). Because the subsidy is fixed by the benchmark, not by the vendor's bill, any quotation above the benchmark is paid by you.

At 2.18 kWp the benchmark is ₹1,08,100 and the central subsidy ₹63,240. A General household gets ₹34,050 from the state and pays ₹10,810; an SC/ST household gets ₹39,455 and pays ₹5,405.

Worked examples

All amounts in rupees; 'pays' is the household's contribution when the quotation equals the benchmark.

  • 1.74 kWp — benchmark 87,000; central 52,200; state 26,100 (General) or 30,450 (SC/ST); pays 8,700 or 4,350.
  • 2 kW — benchmark 1,00,000; central 60,000; state 30,000 or 35,000; pays 10,000 or 5,000.
  • 2.18 kWp — benchmark 1,08,100; central 63,240; state 34,050 or 39,455; pays 10,810 or 5,405.

Eligibility for the Gujarat top-up

  • Residential consumer.
  • Total capacity up to 2.18 kWp (DC).
  • System commissioned on or after 22 October 2026.
  • If you already have solar of X kWp, the new Y kWp qualifies only while X + Y stays within 2.18 kWp.
  • Beneficiaries cannot add more rooftop capacity for three years from installation.
  • Paid by DBT through the DISCOMs, with GUVNL as the nodal agency.

The central subsidy under PM Surya Ghar

PM Surya Ghar: Muft Bijli Yojana pays a Central Financial Assistance (CFA) on residential rooftop solar. It is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, so a 1 kW system gets ₹30,000, 2 kW gets ₹60,000 and 3 kW or more gets the maximum ₹78,000. Nothing is paid for capacity above 3 kW.

North-Eastern states, Uttarakhand, Himachal Pradesh, Jammu & Kashmir, Ladakh and the island territories are special-category regions with a 10% higher rate — ₹33,000 per kW for the first 2 kW and ₹19,800 for the third — which makes the 3 kW maximum ₹85,800.

The central subsidy needs a registered vendor, modules made with domestically produced cells, and a net meter. You apply on the National Portal for Rooftop Solar (pmsuryaghar.gov.in) and the subsidy is paid into your bank account after the system is inspected and commissioned. As published, the scheme is scheduled to run until 31 March 2027.

How to apply

  • Register on the National Portal for Rooftop Solar (pmsuryaghar.gov.in) with your state, DISCOM and electricity consumer number.
  • Apply for rooftop solar, then wait for feasibility approval from your DISCOM.
  • Get the system installed by a vendor registered on the portal, and submit the plant details.
  • Apply for net metering and complete the DISCOM inspection and commissioning.
  • Upload your bank account details and a cancelled cheque so the subsidy can be credited.

How to use this calculator

  • Set the capacity of the system you plan to install, in kWp (DC) — the number on your vendor's quotation.
  • Enter your vendor's quotation if you have one, otherwise leave it blank and the calculator uses a typical cost per kW.
  • Open 'Edit rates' if a rate has changed since this page was updated — every figure recalculates instantly.
  • Add an electricity rate to see the yearly bill saving and a simple payback period.
  • Download the result as a one-page PDF, optionally with your name, consumer number, DISCOM and installer printed on it.

What this estimate does not cover

The calculator does not check whether your roof, DISCOM or consumer category qualifies, and it cannot see local rules such as feeder-level capacity limits. GST, structure upgrades, meter charges and loan interest are not modelled. The payback figure is a simple, undegraded estimate that assumes about 1,400 units a year per kW — real generation depends on your location, shading and tilt.

Frequently asked questions

What happens if my system is larger than 2.18 kWp?

The Gujarat top-up does not apply and only the central PM Surya Ghar subsidy is paid — up to ₹78,000 for 3 kW or more. The calculator shows this automatically.

I already have solar. Can I still claim?

Yes, as long as your existing capacity plus the new system stays within 2.18 kWp. Enter the existing capacity in the calculator and it checks the limit for you.

Why is the state subsidy different for SC/ST households?

Both categories get the same benchmark and central subsidy, but SC/ST households contribute 5% of the benchmark instead of 10%. The state covers the difference, so its share is higher.

Can I change the rates if the government revises them?

Yes. Open 'Edit rates (advanced)' to change the benchmark, central subsidy, contribution percentages and capacity limit, then use 'Reset to default rates' to go back.

Is this calculator free and does it store my details?

Yes, it is free with no registration. Everything is calculated in your browser, and any details you add for the PDF are used only to build that file on your device — nothing is uploaded.

Can I get both the central and the state subsidy?

Where a state runs a top-up, it is paid in addition to the central PM Surya Ghar subsidy, usually through the same application. Each state has its own conditions on system size, category and timing, which are listed on its page.

Is the subsidy calculated on my vendor's bill?

The central subsidy is a fixed amount per kW, not a share of your bill. Some state schemes work from a benchmark cost instead of the actual quotation. Either way, anything you pay above the benchmark or the subsidy-eligible cost is yours to bear.

How accurate are these figures?

They follow the central scheme and each state's announced top-up as reported when this page was last updated. State amounts change with budgets and government orders, so treat the result as an estimate and confirm the final figure with the National Portal and your DISCOM before you sign with a vendor.

Related tools

Disclaimer: results are estimates based on the inputs and published rules/rates, for information only — not investment, tax or legal advice. Verify important decisions with a qualified professional. See our full disclaimer.